ROOFING
![]() |
We lay tarps from the roof to the ground, when the roof is being stripped. |
| We install 8" drip edge, not 4" at the bottom edge and along side. | |
![]() |
We install an Ice and Water Barrier along the bottom edge, along the side of the roof, in valleys, around dormers, and around stink pipes. |
| We install heavy duty felt paper on entire roof. We weave all valleys instead of cutting them. | |
![]() |
We install heavy duty felt paper on entire roof. |
| We install every shingle with six nails per shingle. |